Resources

Laboratory Relocation FAQs

Get clear answers to common questions about timelines, costs, compliance, and moving sensitive lab assets.

Lab researcher working in a laboratory

Essential Questions Answered for Your Laboratory Move

Relocating a laboratory involves numerous complexities that extend far beyond a standard commercial move. At Laboratory Movers, we’ve compiled answers to the most frequently asked questions about laboratory relocations to help you navigate this challenging process with confidence and ensure research continuity.

How do you safely move laboratory equipment?

The safe relocation of laboratory equipment requires specialized expertise and handling techniques:

  • Comprehensive Risk Assessment: Before any equipment is moved, our specialists conduct a detailed assessment identifying equipment-specific requirements, fragility factors, and potential hazards.
  • Customized Protection Systems: We implement equipment-specific protection protocols using specialized materials designed for scientific instruments, including anti-vibration platforms, temperature-controlled environments, and custom stabilization systems.
  • Detailed Documentation: Our team creates comprehensive documentation for each piece of equipment, including current configurations, connection requirements, and calibration specifications.
  • Specialized Transport Equipment: Laboratory Movers utilizes vehicles specifically designed for scientific equipment transport, featuring air-ride suspension, climate control, and power backup systems.
  • Post-Move Verification: After arrival, our technicians conduct thorough inspections and basic functionality checks before assisting with recalibration protocols.

How long does a laboratory relocation typically take?

The timeline for laboratory relocation varies based on several factors, including facility size, equipment complexity, and regulatory requirements:

  • Small Research Laboratories (1-3 rooms): Typically requires 1-2 weeks for planning and 2-4 days for physical relocation.
  • Mid-Sized Facilities (4-10 lab rooms): Generally needs 4-8 weeks of planning and 1-2 weeks for the physical move.
  • Large Research Centers or clinical facilities: May require 3-6 months of advance planning with the physical move executed in carefully coordinated phases over several weeks.
  • Specialized Containment Laboratories (BSL-3/BSL-4): Can require 6-12 months of planning due to extensive regulatory requirements and specialized decontamination protocols.

What should a comprehensive laboratory relocation checklist include?

A well-developed laboratory relocation checklist serves as your roadmap throughout the move:

Planning Phase (3-6 months before)

  • Complete inventory of all equipment and materials
  • Assignment of move coordinators and team responsibilities
  • Regulatory compliance assessment
  • Budget development and approval
  • Selection of specialized laboratory movers

Pre-Move Phase (1-3 months before)

  • Finalization of new facility floor plans
  • Utility and infrastructure verification
  • Equipment decommissioning schedule
  • Specialized packing materials procurement
  • Staff training on relocation protocols

Move Execution Phase

  • Sequential equipment shutdown
  • Hazardous materials handling and documentation
  • Temperature-sensitive material transport protocols
  • Chain of custody documentation
  • Transport vehicle tracking

Post-Move Phase

  • Equipment placement according to approved floor plans
  • Utility connections and testing
  • Initial equipment functionality verification
  • Environmental monitoring system activation
  • Calibration and validation scheduling

Additional Critical Considerations for Laboratory Relocations

Regulatory Compliance Management

Laboratory relocations often involve materials and equipment subject to strict regulatory oversight. Laboratory Movers’ specialists help navigate:

  • DEA controlled substance transfers
  • EPA hazardous waste protocols
  • Department of Transportation requirements
  • CDC/USDA permits for biological materials
  • Radiation safety compliance for licensed materials

Minimizing Research Disruption

Maintaining research continuity requires strategic planning:

  • Phased moving approach for critical systems
  • Temporary duplicate setups for time-sensitive research
  • Sample management protocols for ongoing experiments
  • Data backup and migration planning
  • Carefully coordinated equipment shutdown sequences

Managing Specialized Systems

Critical laboratory infrastructure requires particular attention:

  • Biosafety cabinets and containment systems
  • Gas and specialty gas delivery systems
  • Water purification systems
  • Environmental monitoring networks
  • Emergency backup systems

Partner with Laboratory Movers for a Seamless Transition

Each laboratory relocation presents unique challenges, but with proper planning and specialized expertise, the process can proceed smoothly with minimal disruption to your research activities. Laboratory Movers combines decades of experience with purpose-built equipment to ensure your valuable research assets transition safely to their new location.

Contact Laboratory Movers today to discuss your specific laboratory relocation requirements and develop a customized transition plan.